Kristan Duthie
Operations Manager, Water and Civil

Water is Benang's founding discipline and still its deepest. Our crews build and renew water mains from DN80 to DN630 in MSCL, PVC-M, HDPE and DICL, by open cut and by our own trenchless HDD rigs. We deliver live network cutovers and critical shutdowns, deep sewer to 4.5 metres, pump stations, wastewater treatment plant upgrades, ponds and reservoirs, and the pressure testing, disinfection and commissioning that hand assets back to Water Corporation standard. Led by Kristan Duthie, Operations Manager for Water and Civil, the team self-performs the full cycle from pre-construction surveys to final reinstatement, so one crew is accountable for the result.
Key clients: Water Corporation, Development WA, and local government.
Longest single water main
Largest diameter delivered
Deepest sewer installed
Effluent storage added at Hyden
Lost time injuries across the Water portfolio
HDD, open-cut, and thrust bore installation up to 630mm OD. MSCL, DICL, HDPE, and UPVC pipe all within scope.
Engineered earthwork ponds, concrete reservoirs, and liner installation for Water Corporation and private clients.
Gravity sewer, pressure main, and stormwater drainage construction in metropolitan and regional WA.
Residential and commercial connection to reticulation mains, including meter installation and commissioning.
Emergency response and planned maintenance across the water network, with crews based in Perth Metro.
A selection of the water infrastructure Benang has delivered for Water Corporation across Perth Metro and regional Western Australia.
| Project | Client | Scope | Duration |
|---|---|---|---|
| Metro Water Reticulation Renewals, Package 2 | Water Corporation | Live metro mains renewed by open cut and HDD, with customers kept on supply through every cutover. | 2024 to 2025 |
| Kojonup to Katanning pipeline | Water Corporation | 2,300 metres of DN300 MSCL main with trenchless crossings under Main Roads highways. | 2023 |
| HLZ Pipeline 500mm OD MSCL | Water Corporation | 500mm MSCL water main installed across brownfield and greenfield ground at Medina, with a peak crew of 30. | 2023 |

Operations Manager, Water and Civil

Project Engineer

Project Supervisor

Office of the Federal Safety Commissioner
Accredited for Australian Government funded construction work.

Supply Nation
Certified Aboriginal-owned business.

Quality management
Quality management system certified.

Environmental management
Environmental management system certified.

Occupational health and safety
Occupational health and safety management system certified.
What else we do



Whether you are planning a mains renewal, a live network cutover, or a treatment plant upgrade, Benang's Water team is ready to help. Tell us about your project and we will respond within one business day.