Benang-branded power distribution substation with orange chevron at dusk with transmission towers in the background

Power.

From Perth's metropolitan grid to Rottnest Island and the Pilbara, Benang's Power team designs, installs, commissions and maintains the high and low voltage infrastructure that keeps Western Australia running.

About the Power team

Power infrastructure, built by our own crews.

Benang builds and maintains power infrastructure across Western Australia, from greenfield installation through to ongoing network maintenance. We deliver for the asset owners and head contractors who keep the network running, and we do it with our own people and plant.

We sit on the Western Power Network Support Services (NSS) Panel, where we deliver cable laying, trenching, dry-vac excavation, directional drilling, and substation construction and maintenance. We are actively pursuing positions on more critical panels including ENCP, as Western Power's annual construction and maintenance program, currently exceeding six hundred million dollars per year, is forecast to grow beyond a billion dollars over the next decade.

Our Power team brings the discipline of an asset owner contractor, the ingenuity of a builder, and the cultural responsibility of an Aboriginal-owned business. We self-perform our work. That means our supervisors, our cable hands, our drillers and our jointers are Benang people, accountable to one chain of command and one safety culture.

  • NSS PANEL

    Western Power Network Support Services

  • ZERO

    Lost time injuries

  • ZERO

    Environmental incidents

  • 15%

    Aboriginal participation

  • TIER 1

    Delivery partner, Western Power

By the numbers

Delivering at scale

2.6km

High voltage cable single shot, Aveley. Our longest continuous cable pull to date.

4

1MVA kiosk substations commissioned for Rottnest Island Authority.

760m+

HDD installed under rail, road and sensitive environments.

12+

Active Western Power projects delivered in 24 months.

3

Asset owner panel clients: Western Power, Rottnest Island Authority, Fortescue.

40+

Benang staff self-performing, one chain of command.

Benang Power crews, fleet and drilling equipment staged in front of a substation in the Western Australian outback
What we deliver

Power capabilities

Our Power capability spans the full lifecycle of energy infrastructure, from initial service location and survey through to commissioning, handover and ongoing maintenance. Each service area is delivered by qualified Benang personnel using our own fleet, with no reliance on external sub-contracting for core works.

Cable laying

Efficient and safe installation of high and low voltage electrical cables using advanced equipment, across HDPE conduit, direct buried, catenary and underground configurations.

HV and LV cabling

HV and LV cable supply, pulling, jointing, terminating and testing, in conduit and direct buried, including feeders into critical sites such as St John of God Hospital.

Service locating

Accurate detection and mapping of underground utilities to prevent damages during construction, integrated with survey and soil testing.

Trenching

Application of modern trenching techniques to ensure optimal installation depth and alignment of utility conduits, including in congested brownfield environments.

Dry-vac excavation

Non-destructive excavation that safely exposes underground utilities and reduces the risk of strikes on existing infrastructure. We operate our own dry-vac trucks and crews.

Horizontal directional drilling

Minimally invasive trenchless installation of utilities under roads, rail corridors, environmentally sensitive areas and urban streetscapes. Our drilling team delivers HDPE and conduit installations from short shots to multi-kilometre runs.

Substation construction and maintenance

Comprehensive services from groundwork to electrical integration, including kiosk substations, indoor switchrooms, ring main units and HV switchgear, with a focus on reliability and efficiency.

Overhead removal and underground conversion

Pole and overhead conductor removal, conversion to underground reticulation, installation of new street light poles and uni-pillars, including night-shift outage management.

Testing and commissioning

Cable testing, jointing verification, overcurrent and fault setting commissioning, and full As Constructed documentation packs aligned to client and asset owner standards.

Decommissioning of existing assets

Safe isolation, removal and disposal of generator connections, redundant cabling, and obsolete electrical infrastructure, with reinstatement to original or improved condition.

Renewable power systems

Solar PV integration, battery and storage interfaces, and renewable system maintenance, supporting the energy transition for asset owners and resources clients.

Street lighting and public realm electrical

Supply and installation of street light poles, public lighting cabling, and uni-pillar configurations, integrated with civil reinstatement.

Flagship contract

Western Power Network Support Services.

Perth Metropolitan Area. 2023 to current.

Our position on the Western Power Network Support Services Panel is the cornerstone of Benang's Power business. Since 2023, we have been delivering cable laying, service locating, trenching, dry-vac excavation, directional drilling, and substation construction and maintenance across the Perth metropolitan area. The program is executed by a peak workforce of fourteen Benang personnel with zero lost time injuries and zero environmental incidents, up to five per cent Aboriginal participation on this panel, and up to 15 per cent across our Power work.

The works span urban, suburban and sensitive environments. They demand close coordination with Western Power asset management teams, traffic management authorities, and the public. Our crews are experienced in delivering against asset owner standards, with a track record of right-first-time delivery, comprehensive As Constructed documentation, and minimal community disruption.

Key project highlights

  • Gnangara Road, AveleyMay to June 2025

    Installation, jointing and testing of 2.6 km of HV cable in 160 mm HDPE via HDD, cable terminations, and commissioning of three new RMU sites.

  • Green Street, Mt HawthornNovember 2024 to February 2025

    Removal of overhead lines and installation of 2 km of LV and HV cable in conduit via HDD, nine 12.5 m street-light poles, a new RMU site, three LV kiosks, and full testing and jointing.

  • Collie HDD Rail CrossingFebruary 2025

    Installation of 160 m of HV cable in 160 mm HDPE under an active rail corridor, with PTA and Arc Infrastructure permit compliance, fluid management plan, and survey monitoring.

  • Salvado Road, SubiacoDecember 2024 to January 2025

    Installation of two HV switchgear and metering units in new indoor switchrooms, 240 m HV cable installation into St John of God Hospital, earthing, testing and commissioning.

  • Morley Drive Overhead RemovalMay 2024

    Night-shift removal of overhead lines and poles, installation of 600 m LV and 315 m of street-light cabling, five 12.5 m poles, three uni-pillars, full testing and jointing.

  • Oats Street Station SupplyAugust 2024

    Installation and testing of a 22 kV substation and 300 m of HV cable.

  • Albany Highway, MaddingtonApril 2024

    Installation of 350 m of 240 V LV cable for new uni-pillar supply, including jointing, testing, traffic management and reinstatement.

Volumes delivered

Power infrastructure volumes delivered

Indicative volumes drawn from Western Power and Rottnest Island Authority works delivered between April 2024 and June 2025.

Featured projects

Trusted on the most challenging electrical works in WA.

Benang power distribution substation at dusk with transmission towers in the background

Rottnest Island Authority

Rottnest Island Power Upgrades

April 2024 to ongoing

Up to 12%

Aboriginal participation

Zero

Lost time injuries

Zero

Environmental incidents

On Rottnest Island, Benang has delivered a series of critical electrical infrastructure upgrades for the Rottnest Island Authority. The headline works were the installation and commissioning of the Geordie Bay 1 MVA Kiosk Substation and the Longreach 1 MVA Kiosk Substation, including site preparation, civil works, foundations, HV and LV cabling, earthing, and the establishment of temporary power supplies during cutover.

Read full case study
Generator and trenched conduit runs on the low voltage power installation at Cloudbreak

Fortescue

Cloudbreak Electrical and Civil Works

Cloudbreak Mine Site, Pilbara WA. October 2020 to current

12 to 20

Peak personnel

Up to 10%

Aboriginal participation

Zero

Lost time injuries

Zero

Environmental incidents

Benang's Power team has delivered ongoing electrical and civil works at Fortescue's Cloudbreak operations in the Pilbara since 2020. Our involvement spans plant hire, HDPE welding, civil works, mechanical installations and electrical supply, demonstrating the multi-disciplinary capability that defines our service offering.

Read full case study
Prefabricated data centre building craned into position at Solomon Hub

Fortescue

Solomon Data Centre

Solomon Mine Site, WA. February to April 2021. 10 weeks

10

Peak personnel

Up to 10%

Aboriginal participation

Zero

Lost time injuries

Zero

Environmental incidents

Benang was engaged by Fortescue to complete all civil, electrical and commissioning works associated with the installation of a new Data Centre at the Solomon Mine Site. The scope included excavation and site preparation, formwork installation, reinforcement and concrete works, installation of structural columns, stairs and railing, the landing of the data centre building, and all associated electrical, communications, testing and commissioning works.

Read full case study
Project record

A track record built on delivery.

A snapshot of the recent power infrastructure work delivered by Benang's team for Western Power, the Rottnest Island Authority and other major asset owners.

Geordie Bay 1 MVA Kiosk Substation
Client
Rottnest Island Authority
Scope
Installation and commissioning of new 1 MVA kiosk substation, including foundation construction, HV/LV cables and pits, jointing, testing and commissioning.
Duration
June to July 2024
RIA Parker Point HDD
Client
Rottnest Island Authority
Scope
Installation of 600 m of 160 mm HDPE and 150 m of 110 mm HDPE via HDD for future Parker Point substation upgrade.
Duration
August to September 2024
Gnangara Road Aveley HV Cable and RMU Installation
Client
Western Power
Scope
Installation, jointing and testing of 2.6 km of HV cable in 160 mm HDPE via HDD, cable terminations, commissioning of three new RMU sites.
Duration
May to June 2025
Green Street, Mt Hawthorn
Client
Western Power
Scope
Removal of overhead lines and installation of 2 km of LV/HV cable in conduit via HDD, nine 12.5 m street-light poles, new RMU site and three LV kiosks, testing and jointing.
Duration
November 2024 to February 2025
Collie HDD Rail Crossing
Client
Western Power
Scope
Installation of 160 m of HV cable in 160 mm HDPE under rail corridor, PTA and Arc Infrastructure permit compliance, fluid management plan and survey monitoring.
Duration
February 2025
Salvado Road, Subiaco
Client
Western Power
Scope
Installation of two HV switchgear and metering units in new indoor switchrooms, 240 m HV cable installation into SJOG Hospital, earthing, testing and commissioning.
Duration
December 2024 to January 2025
Morley Drive Overhead Removal
Client
Western Power
Scope
Removal of overhead lines and poles on night-shift outages, installation of 600 m LV and 315 m of street-light cabling, five 12.5 m poles, three uni-pillars, cable testing and jointing.
Duration
May 2024
Oats Street Station Supply
Client
Western Power
Scope
Installation and testing of 22 kV substation and 300 m of HV cable.
Duration
August 2024
Albany Highway, Maddington
Client
Western Power
Scope
Installation of 350 m of 240 V LV cable for new uni-pillar supply, cable jointing and testing, traffic management, reinstatement.
Duration
April 2024
Longreach 1 MVA Kiosk Substation
Client
Rottnest Island Authority
Scope
Installation of 1 MVA kiosk substation and LV switchboard, including foundations, HV/LV cables and pits, jointing, testing and commissioning.
Duration
February to May 2025
Chichester Bigge Farewest LV
Client
Fortescue, Cloudbreak Mine Site
Scope
Service location, survey and soil testing, decommissioning of generator connections, installation of 1,600 m of LV underground distribution cabling, 1,270 m of catenary and underground cabling to bore pumps, testing and verification.
Duration
December 2022, 16 weeks
FMG Solomon Mine Data Centre
Client
Fortescue, Solomon Mine Site
Scope
Concrete, electrical and communications works for data centre installation.
Duration
February to April 2021, 10 weeks
Our people

The team behind every connection.

Mike Amato, Power Operations Manager at Benang

Mike Amato

Power Operations Manager

Cody Mitchell, Project Coordinator at Benang

Cody Mitchell

Project Coordinator, Power

Deepa Thapa, Project Engineer at Benang

Deepa Thapa

Project Engineer

Workforce

Workforce composition and safety record

Workforce composition and safety record donut chartNon-Indigenous: 85. Aboriginal and Torres Strait Islander: 15.85%15%15%

Up to 15% Aboriginal participation across our Power program.

  • Non-Indigenous
  • Aboriginal and Torres Strait Islander

Safety record (lost time injuries)

ZERO LTI

Environmental record

ZERO INCIDENTS

ISO triple certification

9001 / 14001 / 45001

Why Benang for Power

Multi-utility, self-performing, Aboriginal-owned.

Tier 1 partner to the asset owners that matter.

We deliver directly for Western Power, Water Corporation and ATCO. We sit on the Western Power Network Support Services Panel and we are pursuing engagement on more critical panels including ENCP. Our crews understand asset owner standards because we work to them every day.

Self-performing, end-to-end.

Cable, conduit, drilling, substation, civil, reinstatement and commissioning are all delivered by Benang personnel using Benang plant. There is one team accountable for the result, with no hand-offs, no sub-contractor dependencies for core works, and no excuses.

Australia's only Aboriginal-owned, self-performing multi-utility contractor.

Benang is female and Aboriginal owned and operated, with a Diversity and Inclusion role model status that is underpinned by genuine workforce participation. Up to fifteen percent of our Power workforce identifies as Aboriginal or Torres Strait Islander, supported by an internal cadet pathway.

Triple ISO certified, safety led.

Our integrated management system is certified to ISO 9001 (Quality), ISO 45001 (Workplace Health and Safety) and ISO 14001 (Environment). We are accredited under the Federal Safety Commissioner scheme. Our Power portfolio carries a record of zero lost time injuries and zero environmental incidents.

Where we're headed

Built for the energy transition.

Western Australia's energy market sits at an inflection point. Western Power's annual construction and maintenance program is forecast to grow from over six hundred million dollars per year to beyond a billion dollars over the next decade, driven by aging infrastructure, surging demand, and the transition to renewable generation, storage and decarbonised resources operations.

Benang's Power team is positioning to lead through that transition. We are expanding our technical electrical capability into automation, dewatering pumps, advanced HV jointing, electrical maintenance, commissioning, and design. We are investing in proven and emerging technologies including dry vacuum excavation, topical drone survey, robotic excavation, and remote operations. And we are growing our cadet and apprentice pipeline so that the workforce powering Western Australia's energy future reflects the Country it stands on.

Accreditations

Certified to deliver.

Office of the Federal Safety Commissioner accreditation seal

OFSC Accredited

Office of the Federal Safety Commissioner

Accredited for Australian Government funded construction work.

Supply Nation Certified logo

Supply Nation Certified

Supply Nation

Certified Aboriginal-owned business.

ISO 9001 Quality Management certification mark

ISO 9001

Quality management

Quality management system certified.

ISO 14001 Environmental Management certification mark

ISO 14001

Environmental management

Environmental management system certified.

ISO 45001 Occupational Health and Safety certification mark

ISO 45001

Occupational health and safety

Occupational health and safety management system certified.

Our fleet

Equipment and plant

  • Cable drums and trailers
  • Hydraulic cable pulling equipment
  • Boring machines
  • Excavators (3T to 20T)
  • EWPs (up to 30m)
  • Substation test equipment
  • HV test equipment
  • Float trucks
  • Dry-vac excavation trucks
  • HDD rigs

What else we do

Get in touch

Have a power project? Let's talk.

Whether you are an asset owner planning a long-term program, a head contractor seeking a Tier 1 self-performing partner, or a resources operator delivering electrical infrastructure on site, Benang's Power team is ready to deliver. Tell us about your project and we will respond within one business day.