Benang delivered a full civil to commissioning build of a new data centre at Fortescue's Solomon mine site. The work covered excavation and site preparation, formwork and reinforcement, concrete works, structural steel, building positioning, and all electrical, communications, testing, and commissioning inside a 10 week programme.

Client
Fortescue
Sector
Mining and Resources
Services
Civil, Power
Location
Solomon, Pilbara, WA
Dates
2021
  • Challenge

    Building a data centre at a remote Pilbara mine site meant covering every discipline, from earthworks to electrical commissioning, inside a 10 week programme and to mine site standards.

  • Approach

    Benang self-performed the build end to end: excavation and site preparation, formwork and reinforcement, concrete works, structural steel including columns and stairs, positioning of the building, then the electrical and communications fit out with full testing and commissioning.

  • Outcome

    The data centre was delivered in a 10 week programme with zero lost time injuries, zero environmental incidents, and 10 per cent Aboriginal participation.

Prefabricated data centre building craned into position at Solomon Hub
10

Week delivery programme

10%

Aboriginal participation

Crane lowering the data centre module onto its steel footings
Crane rigged for the data centre module lift at Solomon
0

Lost time injuries

0

Environmental incidents

Completed data centre building on elevated footings at Solomon
Steel support structure beneath the data centre building
Cable runs and services beneath the elevated data centre floor
Excavator preparing the data centre pad at Solomon
Access stairs and handrails on the completed building
Data centre module on temporary supports during installation
Completed Solomon data centre building with site vehicle
More work
Generator and trenched conduit runs on the low voltage power installation at Cloudbreak
Mining and Resources

Chichester Bigge Farewest LV, Cloudbreak

Cloudbreak, Pilbara, WA2023
Benang vac truck and excavator on dewatering works at a Fortescue site
Mining and Resources

Fortescue Civil & Dewatering, via TCD Civil

Pilbara, WA2020
Work with us

Discuss your next project

Benang brings its full self-performing capability to every job. Get in touch to discuss how we can support your project.