Our projects.
Critical infrastructure delivered end to end across Western Australia.
Critical infrastructure delivered end to end across Western Australia. Water, power, gas pipeline, fabrication and civil projects for utilities, mining and resources, oil and gas and land development, with the same capability ready for defence.

Butler Civil Works, Lot 1757 Fintona Crescent
DevelopmentWA
Civil, Water, PowerLand Development
Subdivision civil works beside occupied homes, from earthworks and sewer to water and Western Power reticulation and roadworks.

448 Nicholson Road Intersection
11 Acre Farm
CivilLand Development
A new slip lane on an operating road, with HDD service crossings, pavement, asphalt, kerbing and line marking.

HV Cable Into A Live Substation, Henderson
Western Power
PowerUtilities
Around 2,240 metres of high voltage cable with rail under-bores, delivered across three Western Power outages.

End-to-End Power Connection, Bullsbrook
Western Power
PowerUtilities
Around 10 km of underground power cable with HV switchgear and metering, tested and commissioned around live outages.

North Lake Grace Tanker Fill Point
Water Corporation
Water, CivilUtilities
A new water tanker fill point with stormwater drainage, access track, trafficable service pits and fencing.

The Parkway Earthworks, Ellenbrook
DevelopmentWA
CivilLand Development
Site establishment and bulk earthworks preparing Lot 29 for the building contractor.

CuNi Pipe Spools
Vermilion Energy
FabricationOil & Gas
Copper nickel pressure piping welded to ASME Section IX with third-party dimensional surveying and NATA-certified testing.

Galv Pipe Spools
TCD
FabricationMining & Resources
500NB and 600NB process pipe spools and support steelwork, hot-dip galvanised to AS 4680.

Painted Piping With C18 Epoxy Novolac Coating
Fortescue
FabricationMining & Resources
Carbon steel pipe spools with internal C18 Epoxy Novolac lining, NATA-certified NDT and hydrotesting.

Painted Pipe Spools And Galv Structural Steel
Beach Energy
FabricationOil & Gas
AS 4041 pressure piping and AS 5131 structural steel, painted and galvanised, independently dimensionally surveyed.

Duplex And Super Duplex Piping
Vermilion Energy
FabricationOil & Gas
Complete duplex and super duplex pressure piping package with ASME IX welding, pickling and passivation, and painted structural supports.

Project Moorditj Gas Infrastructure Program
ATCO
GasUtilities
HDPE gas mains, live insertions and full reinstatement across Perth's most congested verges.

Leach Highway and North Lake Road HDD
ATCO
GasUtilities
A 160mm gas main installed by horizontal directional drilling with Benang's own rig and coil trailer.

Western Power Network Support Services
Western Power
PowerUtilities
Cable laying, HDD, dry-vac excavation and substation works under the Western Power Network Support Services Program.

Metro Water Reticulation Renewals, Package 2
Water Corporation
WaterUtilities
Live metro water main renewals by open cut and HDD, with customers kept on supply through every cutover.

Rottnest Island Power Upgrades
Rottnest Island Authority
PowerUtilities
Island electrical infrastructure upgrades with underground cables installed by horizontal directional drilling.

Kojonup To Katanning Pipeline
Water Corporation
WaterUtilities
2,300 metres of DN300 MSCL main with trenchless DN600 crossings under two Main Roads corridors.

HLZ Pipeline 500mm OD MSCL
Water Corporation
WaterUtilities
500mm MSCL main across brownfield and greenfield ground with a peak crew of 30.

Hyden Wastewater Treatment Plant Upgrade
Water Corporation
WaterUtilities
Two new dams and 900,000 litres of added effluent storage, with 60 per cent Aboriginal participation.

Chichester Bigge Farewest LV, Cloudbreak
Fortescue, via TCD Civil Construction
PowerMining & Resources
2,870 metres of LV distribution cabling across 32 runs on an active Pilbara mine site.

Farmlands Pipe Replacement, Narembeen
Water Corporation
WaterUtilities
349 metres of new DN200 and DN250 MSCL main with trenchless crossings of Merredin Narembeen Road.

630mm Pipeline Cutover, Mirrabooka
Water Corporation
WaterUtilities
Critical live-network night shutdown on a 630mm MSCL main, completed inside a single month.

Ellenbrook Potable Water Dam Civil Works
WaterUtilities
Erosion control, drainage infrastructure and embankment rehabilitation at a potable water dam.

ATCO Maintenance And Project Services
ATCO
GasUtilities
Wet hire services and gas main installation and replacement across the ATCO network since 2021.

Solomon Data Centre
Fortescue
Civil, PowerMining & Resources
Full civil to commissioning data centre build delivered in a 10 week programme.

Fortescue Civil & Dewatering
Fortescue, via TCD Civil Construction
Water, CivilMining & Resources
Ongoing dewatering and civil works with plant hire, HDPE welding and electrical services since 2020.

Narembeen Mains Replacement
Water Corporation
WaterUtilities
Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a four week window.

Babakin Main Extension
Water Corporation
WaterUtilities
Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a five week window.

Herdsman Lake Civil And Drainage
Water Corporation
CivilUtilities
Litter booms, pile anchors, hardstand, platforms and rock protection across three Herdsman Lake sites.

Gwelup Surge Vessel Bypass
WaterUtilities
DN100 MSCL pipework replacement on the surge vessel bypass at Gwelup.

Main Drain Upgrade, Gwelup
CivilUtilities
Main drain support walls for erosion control, built through groundwater in a three metre right of way.

Katanning WWTP Improvements
WaterUtilities
Piping, pontoon control vessel, valve and manhole upgrades and civil remediation in five weeks.

Racecourse Gas Main Installation, Belmont
GasUtilities
New gas mains and services for Belmont Racecourse with full testing, commissioning and reinstatement.

EG40 Bore Pad, Eglinton
CivilUtilities
Access upgrade, culvert and a 200mm limestone bore pad inside a heritage sensitive area.

Brand Highway Culvert And Drainage Works
CivilLand Development
Drainage culvert upgrades across a 19 kilometre stretch of live highway in eight weeks.