Aerial view of bulk earthworks at The Parkway, Ellenbrook, with haul roads and plant across the site

Our projects.

Critical infrastructure delivered end to end across Western Australia.

Critical infrastructure delivered end to end across Western Australia. Water, power, gas pipeline, fabrication and civil projects for utilities, mining and resources, oil and gas and land development, with the same capability ready for defence.

Drone view of the cleared and levelled Butler subdivision site beside the rail line and a main road, with plant working across the pad

Butler Civil Works, Lot 1757 Fintona Crescent

DevelopmentWA

Civil, Water, PowerLand Development

Subdivision civil works beside occupied homes, from earthworks and sewer to water and Western Power reticulation and roadworks.

Freshly sealed new slip lane along Nicholson Road marked with traffic cones and barriers, beside bushland

448 Nicholson Road Intersection

11 Acre Farm

CivilLand Development

A new slip lane on an operating road, with HDD service crossings, pavement, asphalt, kerbing and line marking.

Two Benang workers laying orange cable protection over the trench inside the live Western Power substation at Henderson

HV Cable Into A Live Substation, Henderson

Western Power

PowerUtilities

Around 2,240 metres of high voltage cable with rail under-bores, delivered across three Western Power outages.

A green high voltage kiosk substation being craned onto its concrete plinth at Morley Road, Bullsbrook

End-to-End Power Connection, Bullsbrook

Western Power

PowerUtilities

Around 10 km of underground power cable with HV switchgear and metering, tested and commissioned around live outages.

Aerial view of the North Lake Grace tank site and fill point beside the highway among wheatbelt paddocks

North Lake Grace Tanker Fill Point

Water Corporation

Water, CivilUtilities

A new water tanker fill point with stormwater drainage, access track, trafficable service pits and fencing.

Aerial view of the Lot 29 earthworks at The Parkway, Ellenbrook, with stripped ground, a sand haul road and Benang machines at work

The Parkway Earthworks, Ellenbrook

DevelopmentWA

CivilLand Development

Site establishment and bulk earthworks preparing Lot 29 for the building contractor.

Copper nickel pipe spools with flanged risers strapped to a timber pallet for delivery

CuNi Pipe Spools

Vermilion Energy

FabricationOil & Gas

Copper nickel pressure piping welded to ASME Section IX with third-party dimensional surveying and NATA-certified testing.

Hot-dip galvanised pipe spools with bolted end flanges ready for dispatch

Galv Pipe Spools

TCD

FabricationMining & Resources

500NB and 600NB process pipe spools and support steelwork, hot-dip galvanised to AS 4680.

Coated carbon steel spool strapped to a pallet for transport

Painted Piping With C18 Epoxy Novolac Coating

Fortescue

FabricationMining & Resources

Carbon steel pipe spools with internal C18 Epoxy Novolac lining, NATA-certified NDT and hydrotesting.

Carbon steel pipe spools with gold flanges on jack stands in the Benang workshop

Painted Pipe Spools And Galv Structural Steel

Beach Energy

FabricationOil & Gas

AS 4041 pressure piping and AS 5131 structural steel, painted and galvanised, independently dimensionally surveyed.

Stainless duplex pipe spools with flanged ends strapped into a blue transport crate at the Benang workshop

Duplex And Super Duplex Piping

Vermilion Energy

FabricationOil & Gas

Complete duplex and super duplex pressure piping package with ASME IX welding, pickling and passivation, and painted structural supports.

Gas blending skid with yellow pipework and pressure vessels at an ATCO facility

Project Moorditj Gas Infrastructure Program

ATCO

GasUtilities

HDPE gas mains, live insertions and full reinstatement across Perth's most congested verges.

White Benang vacuum excavation truck parked on a gravel yard

Leach Highway and North Lake Road HDD

ATCO

GasUtilities

A 160mm gas main installed by horizontal directional drilling with Benang's own rig and coil trailer.

A high voltage transmission tower at dusk with glowing orange power lines streaming from it

Western Power Network Support Services

Western Power

PowerUtilities

Cable laying, HDD, dry-vac excavation and substation works under the Western Power Network Support Services Program.

Water Corporation and Benang crew at a Metro water pipe renewal project site

Metro Water Reticulation Renewals, Package 2

Water Corporation

WaterUtilities

Live metro water main renewals by open cut and HDD, with customers kept on supply through every cutover.

Benang directional drilling truck with conduit ducts on the Rottnest Island power upgrades

Rottnest Island Power Upgrades

Rottnest Island Authority

PowerUtilities

Island electrical infrastructure upgrades with underground cables installed by horizontal directional drilling.

Benang crew guiding a pipe section on slings toward the trench, with a loader and an excavator, on the Kojonup to Katanning pipeline

Kojonup To Katanning Pipeline

Water Corporation

WaterUtilities

2,300 metres of DN300 MSCL main with trenchless DN600 crossings under two Main Roads corridors.

Excavator lifting a 500mm OD MSCL pipe string into position at Medina

HLZ Pipeline 500mm OD MSCL

Water Corporation

WaterUtilities

500mm MSCL main across brownfield and greenfield ground with a peak crew of 30.

Excavator placing geofabric and blockwork across the effluent storage pond floor at Hyden

Hyden Wastewater Treatment Plant Upgrade

Water Corporation

WaterUtilities

Two new dams and 900,000 litres of added effluent storage, with 60 per cent Aboriginal participation.

Generator and trenched conduit runs on the low voltage power installation at Cloudbreak

Chichester Bigge Farewest LV, Cloudbreak

Fortescue, via TCD Civil Construction

PowerMining & Resources

2,870 metres of LV distribution cabling across 32 runs on an active Pilbara mine site.

Excavator laying the new water main in an open trench through Narembeen farmland

Farmlands Pipe Replacement, Narembeen

Water Corporation

WaterUtilities

349 metres of new DN200 and DN250 MSCL main with trenchless crossings of Merredin Narembeen Road.

Gate valve and 630mm pipe assembly lifted on slings for the Mirrabooka cutover

630mm Pipeline Cutover, Mirrabooka

Water Corporation

WaterUtilities

Critical live-network night shutdown on a 630mm MSCL main, completed inside a single month.

Rock armoured embankment at the Ellenbrook potable water tank site

Ellenbrook Potable Water Dam Civil Works

WaterUtilities

Erosion control, drainage infrastructure and embankment rehabilitation at a potable water dam.

Traffic managed ATCO gas works on a Perth street

ATCO Maintenance And Project Services

ATCO

GasUtilities

Wet hire services and gas main installation and replacement across the ATCO network since 2021.

Prefabricated data centre building craned into position at Solomon Hub

Solomon Data Centre

Fortescue

Civil, PowerMining & Resources

Full civil to commissioning data centre build delivered in a 10 week programme.

Benang operator servicing dewatering plant on a Fortescue Pilbara site

Fortescue Civil & Dewatering

Fortescue, via TCD Civil Construction

Water, CivilMining & Resources

Ongoing dewatering and civil works with plant hire, HDPE welding and electrical services since 2020.

Benang worker compacting the trench inside the shoring box on the Narembeen mains replacement

Narembeen Mains Replacement

Water Corporation

WaterUtilities

Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a four week window.

Trenching along the main extension route through Babakin farmland

Babakin Main Extension

Water Corporation

WaterUtilities

Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a five week window.

Fencing extension and bollards along the northern bank at Herdsman Lake

Herdsman Lake Civil And Drainage

Water Corporation

CivilUtilities

Litter booms, pile anchors, hardstand, platforms and rock protection across three Herdsman Lake sites.

Twin surge vessels with the new green DN100 MSCL bypass pipework and valves at Gwelup

Gwelup Surge Vessel Bypass

WaterUtilities

DN100 MSCL pipework replacement on the surge vessel bypass at Gwelup.

The upgraded main drain corridor at Gwelup

Main Drain Upgrade, Gwelup

CivilUtilities

Main drain support walls for erosion control, built through groundwater in a three metre right of way.

Valve upgrade works under way at the Katanning wastewater treatment plant

Katanning WWTP Improvements

WaterUtilities

Piping, pontoon control vessel, valve and manhole upgrades and civil remediation in five weeks.

Trenching for the new gas mains near the racecourse

Racecourse Gas Main Installation, Belmont

GasUtilities

New gas mains and services for Belmont Racecourse with full testing, commissioning and reinstatement.

Roller, posi-track and loader working the cleared bore pad at Eglinton

EG40 Bore Pad, Eglinton

CivilUtilities

Access upgrade, culvert and a 200mm limestone bore pad inside a heritage sensitive area.

Excavated culvert extension beside the live Brand Highway with traffic management in place

Brand Highway Culvert And Drainage Works

CivilLand Development

Drainage culvert upgrades across a 19 kilometre stretch of live highway in eight weeks.

Work with us

Ready to discuss your project?

Our team is ready to help. Whether you are scoping a tender, planning a build, or exploring multi-utility delivery, get in touch.