Project Moorditj Gas Infrastructure Program
ATCO
Self-performed HDPE gas mains, live insertions and full reinstatement across Perth's most congested verges.

Every project here was delivered by Benang crews using Benang plant. Water mains and wastewater, high voltage power, live gas networks and remote mine sites: one self-performing team, one standard.

ATCO
Self-performed HDPE gas mains, live insertions and full reinstatement across Perth's most congested verges.

Western Power
Cable laying, HDD, dry-vac excavation and substation works under the Western Power Network Support Services Program.

Water Corporation
Live metro water main renewals by open cut and HDD, with customers kept on supply through every cutover.

Water Corporation
2,300 metres of DN300 MSCL main with trenchless DN600 crossings under two Main Roads corridors.

Water Corporation
500mm MSCL main across brownfield and greenfield ground with a peak crew of 30.

Water Corporation
Two new dams and 900,000 litres of added effluent storage, with 60 per cent Aboriginal participation.

Water Corporation
349 metres of new DN200 and DN250 MSCL main with trenchless crossings of Merredin Narembeen Road.

Water Corporation
Critical live-network night shutdown on a 630mm MSCL main, completed inside a single month.

Erosion control, drainage infrastructure and embankment rehabilitation at a potable water dam.

ATCO
Wet hire services and gas main installation and replacement across the ATCO network since 2021.

280 metres of deep sewer main and common trench services with full testing and commissioning.

480 metres of sewer main at 4.5 metres depth in a shared multi-utility trench.

Water Corporation
Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a four week window.

Water Corporation
Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a five week window.
Our team is ready to help. Whether you are scoping a tender, planning a build, or exploring multi-utility delivery, get in touch.