Large pipeline with Aboriginal artwork in the Western Australian landscape at sunset
Our work

Projects.

Every project here was delivered by Benang crews using Benang plant. Water mains and wastewater, high voltage power, live gas networks and remote mine sites: one self-performing team, one standard.

Water Corporation and Benang crew at a Metro water pipe renewal project site
Water

Metro Water Reticulation Renewals, Package 2

Water Corporation

Perth Metro, WA2024 to 2025

Live metro water main renewals by open cut and HDD, with customers kept on supply through every cutover.

Aerial view of the Katanning townsite at dusk
Water

Kojonup to Katanning pipeline

Water Corporation

Katanning, WA2023

2,300 metres of DN300 MSCL main with trenchless DN600 crossings under two Main Roads corridors.

Excavator lifting a 500mm OD MSCL pipe string into position at Medina
Water

HLZ Pipeline 500mm OD MSCL

Water Corporation

Medina, WA2023

500mm MSCL main across brownfield and greenfield ground with a peak crew of 30.

Earthworks, new dams, and embankment reshaping at the Hyden wastewater treatment plant
Water

Hyden Wastewater Treatment Plant Upgrade

Water Corporation

Hyden, WA2023

Two new dams and 900,000 litres of added effluent storage, with 60 per cent Aboriginal participation.

Wheatbelt farmland at Narembeen where Benang replaced the Farmlands water main
Water

Farmlands Pipe Replacement, Narembeen

Water Corporation

Narembeen, WA2022 to 2023

349 metres of new DN200 and DN250 MSCL main with trenchless crossings of Merredin Narembeen Road.

Night works on a live 630mm mild steel cement lined water main at Mirrabooka
Water

630mm Pipeline Cutover, Mirrabooka

Water Corporation

Mirrabooka, WA2022

Critical live-network night shutdown on a 630mm MSCL main, completed inside a single month.

Rock armoured embankment at the Ellenbrook potable water tank site
Water

Ellenbrook Potable Water Dam Civil Works

Ellenbrook, WA2022

Erosion control, drainage infrastructure and embankment rehabilitation at a potable water dam.

Benang vac truck and excavator on dewatering works at a Fortescue site
Water, Civil

Fortescue Civil & Dewatering, via TCD Civil

Fortescue, via TCD Civil Construction

Pilbara, WASince 2020

Ongoing dewatering and civil works with plant hire, HDPE welding and electrical services since 2020.

Drainage culvert barrels being extended with critical lifts inside a live rail corridor at Grass Valley
Water, Civil

Grass Valley Rail Culvert Extension

Arc Infrastructure

Grass Valley, WA2020

Two drainage culvert barrels extended with critical lifts inside a live rail corridor.

Deep sewer main installation in a common services trench at Ariella Stage 9
Water

Ariella Stage 9 Deep Sewer

WA2019 to 2020

280 metres of deep sewer main and common trench services with full testing and commissioning.

Benang worker in a deep sewer maintenance shaft at Cape Burney
Water

Cape Burney Deep Sewer Construction

Cape Burney, WA2019

480 metres of sewer main at 4.5 metres depth in a shared multi-utility trench.

New PVC water main replacing asbestos cement pipe at Narembeen
Water

Narembeen Mains Replacement

Water Corporation

Narembeen, WA

Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a four week window.

New PVC water main replacing asbestos cement pipe at Babakin
Water

Babakin Main Extension

Water Corporation

Babakin, WA

Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a five week window.

Work with us

Ready to discuss your project?

Our team is ready to help. Whether you are scoping a tender, planning a build, or exploring multi-utility delivery, get in touch.

Projects | Benang