PowerGovernment

Rottnest Island Power Upgrades

Benang upgraded electrical infrastructure on Rottnest Island for the Rottnest Island Authority, using horizontal directional drilling to install underground cables across the island with minimal surface disturbance.

Client
Rottnest Island Authority
Sector
Government
Services
Power
Location
Rottnest Island, WA
Dates
2024 to 2025
  • Challenge

    Rottnest Island is a sensitive island environment with limited access, so cables had to go underground with minimal surface disturbance.

  • Approach

    Benang upgraded the island's electrical infrastructure and used horizontal directional drilling to install the underground cables, keeping surface disturbance to a minimum across the sensitive island environment.

  • Outcome

    The upgrades were delivered between 2024 and 2025 with zero lost time injuries and zero environmental incidents, including four 1MVA kiosk substations commissioned for the Rottnest Island Authority, strengthening the island's electrical network while the trenchless installation protected the island's surface and vegetation.

Benang power distribution substation at dusk with transmission towers in the background
4

1MVA kiosk substations commissioned

0

Lost time injuries

0

Environmental incidents

More work
Stylised night view of Western Australia glowing with interconnected power network lines
Utilities

Western Power Network Support Services

Perth Metro, WA2024
Generator and trenched conduit runs on the low voltage power installation at Cloudbreak
Mining and Resources

Chichester Bigge Farewest LV, Cloudbreak

Cloudbreak, Pilbara, WA2023
Work with us

Discuss your next project

Benang brings its full self-performing capability to every job. Get in touch to discuss how we can support your project.