PowerUtilities

Western Power Network Support Services

Benang delivers infrastructure services under the Western Power Network Support Services Program across the Perth metro area. The crews self-perform cable laying, service locating, trenching, dry-vac excavation, horizontal directional drilling, and substation work, including overhead to underground conversions.

Client
Western Power
Contract value
$12 million per annum
Sector
Utilities
Services
Power
Location
Perth Metro, WA
Dates
2024 to 2027
  • Challenge

    Network support across a live metro grid means working around energised services, congested verges, and the public, while converting overhead lines to underground and upgrading high voltage feeders without service strikes.

  • Approach

    Benang self-performs the work end to end. At Green Street, Mt Hawthorn the crew delivered an overhead to underground conversion, two kilometres of low and high voltage cable, nine streetlight poles, a new ring main unit site, and three low voltage kiosks. At Gnangara Road, Aveley the crew installed 2.6 kilometres of high voltage cable in 160mm HDPE by horizontal directional drilling and commissioned three new ring main unit sites. Live underground services were exposed safely with the in-house dry-vac truck fleet, and utilities were located and mapped in house to prevent strikes.

  • Outcome

    The programme runs from March 2024 to March 2027, with zero service strikes reported on the cited works and six new ring main unit sites commissioned across the Green Street and Gnangara Road jobs.

Stylised night view of Western Australia glowing with interconnected power network lines
2,600m

HV cable by HDD, Gnangara Road

6

Ring main unit sites commissioned

Benang dry-vac excavation truck and excavator exposing underground services, with orange conduit reel loaded
Orange HDPE conduit on a trailer rack beside Benang's dry-vac truck at a fenced Perth metro compound
14

Peak crew

5%
5% Aboriginal participation, contract

Aboriginal participation, contract

0
0 Lost time injuries

Lost time injuries

Benang horizontal directional drilling rig and crews working along a Perth metro verge
More work
Generator and trenched conduit runs on the low voltage power installation at Cloudbreak
Mining and Resources

Chichester Bigge Farewest LV, Cloudbreak

Cloudbreak, Pilbara, WA2023
HDPE gas main being laid in a congested Perth metro verge
Utilities

Project Moorditj Gas Infrastructure Program

Perth Metro, WA2025
Work with us

Discuss your next project

Benang brings its full self-performing capability to every job. Get in touch to discuss how we can support your project.