End-to-End Power Connection, Bullsbrook

Benang self-performed Western Power's network support package at Morley Road, Bullsbrook, installing around 10 kilometres of underground power cable with HV switchgear and metering units, then testing and commissioning the high voltage cable around live network outages.

Client
Western Power
Sector
Utilities
Services
Power
Location
Bullsbrook, WA
Year
2026
  • Challenge

    The package combined about 10 kilometres of underground power cable with new HV switchgear and metering, installed through congested ground and commissioned around Western Power's live network outages.

  • Approach

    Benang self-performed service locating, HV switchgear and metering unit installation, directional drilling and open trenching for around 10,050 metres of cable, joint holes, high voltage cable jointing, terminations and earthing works, using its own crews and plant throughout.

  • Outcome

    The high voltage cable was tested and commissioned with visual inspection, end-to-end phasing, insulation resistance and DCF 2.1 commissioning, every test passing, and the works were delivered with no safety or environmental incidents.

A green high voltage kiosk substation being craned onto its concrete plinth at Morley Road, Bullsbrook
10km

Underground power cable

0

Safety incidents

Crane lowering the green kiosk substation into position beside the road at Bullsbrook
Freshly poured concrete plinth checked level with a spirit level at the Bullsbrook site
Kiosk substation and switchgear being set on the prepared foundation at Bullsbrook
Benang crew and survey gear around the new substation foundation at Morley Road
The installed kiosk substation on its plinth at the Bullsbrook connection site
Work with us

Discuss your next project

Benang brings its full self-performing capability to every job. Get in touch to discuss how we can support your project.