Kojonup to Katanning pipeline

Benang is building two DN300 mild steel cement lined water mains for Water Corporation between Kojonup and Katanning, totalling 2,300 metres. The work includes trenchless road crossings under Main Roads highways, new connections, scour valves, pressure testing, and full site reinstatement.

Client
Water Corporation
Sector
Utilities
Services
Water
Location
Katanning, WA
Year
2023
  • Challenge

    Two regional water mains had to cross live Main Roads highways without closing them. Open trenching across the Kojonup-Katanning Road and the Great Southern Highway was not an option, so the crossings had to go underground while traffic kept moving.

  • Approach

    Benang self-performed the full pipeline build, installing 2,300 metres of DN300 mild steel cement lined main. At each highway the crew installed DN600 reinforced concrete sleeves by trenchless method, then pulled the carrier main through. New connections, scour valves, and chamber reinstatement were completed in sequence, followed by pressure testing and disinfection to Water Corporation standards.

  • Outcome

    The pipeline was delivered with zero lost time injuries and zero environmental incidents, with Aboriginal participation up to 15 per cent. Both highway crossings went in without a single lane closure.

Aerial view of the Katanning townsite at dusk, where Benang delivered the DN300 water main
2,300m

DN300 MSCL pipeline

24

Peak crew

Two Benang crew guiding a DN300 pipe section into the trench at Katanning
Benang crew jointing the DN300 main in the trench beneath an excavator
15%
15% Aboriginal participation

Aboriginal participation

0
0 Lost time injuries

Lost time injuries

0
0 Environmental incidents

Environmental incidents

Pipe string lifted on slings over the open trench
Excavator working over the open trench along the road verge at Katanning
Pipeline through excavated ground at sunrise on the Kojonup to Katanning alignment
Benang crew lowering a pipe section into position with an excavator
Loader placing a precast concrete valve chamber
Crew fitting a coupling to the main in the trench
Benang worker walking the trench line beside the laid DN300 main
Worker finishing a pipe joint in the trench
Excavator opening the connection pit around the existing main
Deep excavation at a chamber on the pipeline alignment
Excavator beside a concrete chamber under street trees
Benang worker placing pipe bedding in the trench
Benang worker preparing the trench floor for pipe laying
Crew laying pipe along a grassed verge trench at Katanning
More work
Excavator lifting a 500mm OD MSCL pipe string into position at Medina
Utilities

HLZ Pipeline 500mm OD MSCL

Medina, WA2023
Wheatbelt farmland at Narembeen where Benang replaced the Farmlands water main
Utilities

Farmlands Pipe Replacement, Narembeen

Narembeen, WA2022
Work with us

Discuss your next project

Benang brings its full self-performing capability to every job. Get in touch to discuss how we can support your project.