WaterUtilities

Cape Burney Deep Sewer Construction

Benang built shared trench infrastructure at Cape Burney, installing 480 metres of sewer main at 4.5 metres depth alongside a 100mm PVC pressure main and a low voltage electrical network, with testing and commissioning included.

Sector
Utilities
Services
Water
Location
Cape Burney, WA
Dates
November to December 2019
  • Challenge

    Installing sewer at 4.5 metres depth in a shared trench demands strict excavation controls, with a pressure main and an electrical network delivered through the same corridor.

  • Approach

    Benang self-performed the shared trench build, installing 480 metres of sewer main at 4.5 metres depth together with a 100mm PVC pressure main and the low voltage electrical network, then tested and commissioned the services.

  • Outcome

    The works were completed with a peak crew of six, 30 per cent Aboriginal participation, zero lost time injuries, and zero environmental incidents, demonstrating deep excavation and multi-utility trench capability.

Benang worker in a deep sewer maintenance shaft at Cape Burney
480m

Sewer main at 4.5 m depth

6

Peak crew

Poly maintenance chamber and sewer connections in the trench
30%

Aboriginal participation

0

Lost time injuries

More work
Excavator lifting a 500mm OD MSCL pipe string into position at Medina
Utilities

HLZ Pipeline 500mm OD MSCL

Medina, WA2023
Work with us

Discuss your next project

Benang brings its full self-performing capability to every job. Get in touch to discuss how we can support your project.