Benang constructed main drain support walls for erosion control at Gwelup, working through groundwater in a confined three metre right of way beside live traffic, delivered on schedule and within budget.

Sector
Utilities
Services
Civil
Location
Gwelup, WA
Dates
September 2020 to September 2021
  • Challenge

    The main drain needed new support walls to control erosion, with groundwater to manage, a confined three metre right of way to work inside and traffic to keep moving alongside the works.

  • Approach

    Benang constructed the drain support walls progressively along the channel, managing groundwater and working compact plant through the narrow right of way while maintaining traffic management on the surrounding streets.

  • Outcome

    The erosion control walls were delivered on schedule and within budget across September 2020 to September 2021, with no lost time injuries and no environmental incidents.

The upgraded main drain corridor at Gwelup
9

Peak crew

30%

Aboriginal participation

Backfill and compaction behind the completed walls
Support walls progressing along the confined right of way
0

Lost time injuries

Crew placing panels between the drain wall posts
New wall posts set along the drain alignment
Posi-track loader backfilling behind new concrete drain support walls at Gwelup