The Parkway Earthworks, Ellenbrook

Benang self-performed the civil construction and bulk earthworks for DevelopmentWA at Lot 29 The Parkway, Ellenbrook, preparing the site for the building contractor with site establishment, clearing and earthworks.

Client
DevelopmentWA
Sector
Land Development
Services
Civil
Location
Ellenbrook, WA
Year
2026
  • Challenge

    DevelopmentWA needed Lot 29 at The Parkway, Ellenbrook prepared for construction on a tight programme, with earthworks delivered next to occupied properties under WAPC approval and strict dust, noise and traffic controls.

  • Approach

    Benang established the site, then self-performed the earthworks: clearing within approved limits, topsoil stripping and management, bulk excavation and fill, and final trimming, while maintaining access to adjacent properties and managing traffic, dust and noise.

  • Outcome

    The site was shaped and prepared to let the building contractor progress, delivered under WAPC approval with property access maintained and affected areas reinstated.

Aerial view of the Lot 29 earthworks at The Parkway, Ellenbrook, with stripped ground, a sand haul road and Benang machines at work
Excavator loading a topsoil stockpile while a water cart sprays for dust control on the Ellenbrook pad
Roller, water carts and excavator working across the stripped earthworks pad at The Parkway
Earthworks fleet of excavator, dozers, loader, roller and water cart spread across the Lot 29 pad
High aerial view of the Lot 29 earthworks beside the Ellenbrook town centre
Finished trimmed sand pad at Lot 29 The Parkway with neat roller lines, ready for the building contractor