Brand Highway Culvert And Drainage Works

Benang delivered drainage culvert upgrades across a 19 kilometre stretch of Brand Highway near Gin Gin under the principal contractor, completing investigation, design validation, earthworks and concrete formwork beside live traffic in an environmentally sensitive area.

Sector
Land Development
Services
Civil
Location
Gin Gin, WA
Dates
January to March 2020
  • Challenge

    The culvert upgrades ran across multiple locations along 19 kilometres of live highway, in an environmentally sensitive corridor, inside an eight week program.

  • Approach

    Benang completed the investigation and design validation, then delivered the earthworks and concrete formwork needed to extend the existing culverts past the new road boundary, moving the crew location to location under traffic management.

  • Outcome

    The minor capital works packages were delivered inside the eight week program with no lost time injuries and no environmental incidents.

Excavated culvert extension beside the live Brand Highway with traffic management in place
19km

Highway stretch covered

8

Week program

Culvert extension formwork and earthworks in the highway corridor
Works progressing at one of the culvert locations along Brand Highway
6

Peak crew

25%

Aboriginal participation

Completed culvert extension past the new road boundary