Grass Valley Rail Culvert Extension

Benang extended two drainage culvert barrels under a live rail corridor at Grass Valley for Arc Infrastructure, completing investigation, design validation, and earthworks with critical lifts under strict rail safety operations.

Client
Arc Infrastructure
Sector
Land Development
Services
Water, Civil
Location
Grass Valley, WA
Dates
March to April 2020
  • Challenge

    The culverts sit in a live rail environment, so every lift and excavation had to run under critical lifting procedures and strict rail safety operations.

  • Approach

    Benang completed the investigation and design validation, then carried out the earthworks to extend two drainage culvert barrels, executing critical lifts inside the live rail corridor for batter surface water management and erosion control.

  • Outcome

    The extension was completed with 30 per cent Aboriginal participation, zero lost time injuries, and zero environmental incidents.

Twin concrete culvert barrels laid against the headwall at the rail embankment at Grass Valley
2

Culvert barrels extended

30%

Aboriginal participation

New culvert barrel joined to the existing culvert opening under the rail corridor
The two extended culvert barrels face on at the base of the rail embankment
0

Lost time injuries

0

Environmental incidents