North Lake Grace Tanker Fill Point

Benang built a new tanker fill point for Water Corporation at North Lake Grace, delivering the civil works, stormwater drainage, access track, trafficable service pits and fencing for the water cart filling facility.

Client
Water Corporation
Sector
Utilities
Services
Water, Civil
Location
Lake Grace, WA
Year
2026
  • Challenge

    Water Corporation needed its North Lake Grace tank cart point replaced and upgraded, combining civil construction, drainage and fabricated works on a regional site to a fixed completion date.

  • Approach

    Benang located and protected the existing assets, set out the works, and constructed the tanker fill points, around 20 metres of DN450 reinforced concrete stormwater drainage, an unsealed access track, two Class D trafficable service pits and the fencing, including metal fabrication and welding works.

  • Outcome

    The upgraded tanker fill point was delivered for Water Corporation with the drainage, access, service pits and fencing complete, and the site reinstated with an as-constructed survey.

Aerial view of the North Lake Grace tank site and fill point beside the highway among wheatbelt paddocks
20m

DN450 stormwater drainage

2

Trafficable service pits

Two water storage tanks on a concrete pad above the North Lake Grace farmland
Concrete water tank on the rise at North Lake Grace with solar telemetry and access ladder
Pump set and pipework connected to the tank with new HDPE poly line at the fill point
Coils of HDPE poly pipe and a stainless cabinet staged for installation at Lake Grace
Chlorination facility building inside its security fence with farmland behind
Chlorine store building with hazard signage at the North Lake Grace site