Aerial view of bulk earthworks at The Parkway, Ellenbrook, with haul roads and plant across the site

Our projects.

Critical infrastructure delivered end to end across Western Australia.

Critical infrastructure delivered end to end across Western Australia. Water, power, gas pipeline, fabrication and civil projects for utilities, mining and resources, oil and gas and land development, with the same capability ready for defence.

Aerial view of the North Lake Grace tank site and fill point beside the highway among wheatbelt paddocks

North Lake Grace Tanker Fill Point

Water Corporation

Water, CivilUtilities

A new water tanker fill point with stormwater drainage, access track, trafficable service pits and fencing.

Water Corporation and Benang crew at a Metro water pipe renewal project site

Metro Water Reticulation Renewals, Package 2

Water Corporation

WaterUtilities

Live metro water main renewals by open cut and HDD, with customers kept on supply through every cutover.

Benang crew guiding a pipe section on slings toward the trench, with a loader and an excavator, on the Kojonup to Katanning pipeline

Kojonup To Katanning Pipeline

Water Corporation

WaterUtilities

2,300 metres of DN300 MSCL main with trenchless DN600 crossings under two Main Roads corridors.

Excavator lifting a 500mm OD MSCL pipe string into position at Medina

HLZ Pipeline 500mm OD MSCL

Water Corporation

WaterUtilities

500mm MSCL main across brownfield and greenfield ground with a peak crew of 30.

Excavator placing geofabric and blockwork across the effluent storage pond floor at Hyden

Hyden Wastewater Treatment Plant Upgrade

Water Corporation

WaterUtilities

Two new dams and 900,000 litres of added effluent storage, with 60 per cent Aboriginal participation.

Excavator laying the new water main in an open trench through Narembeen farmland

Farmlands Pipe Replacement, Narembeen

Water Corporation

WaterUtilities

349 metres of new DN200 and DN250 MSCL main with trenchless crossings of Merredin Narembeen Road.

Gate valve and 630mm pipe assembly lifted on slings for the Mirrabooka cutover

630mm Pipeline Cutover, Mirrabooka

Water Corporation

WaterUtilities

Critical live-network night shutdown on a 630mm MSCL main, completed inside a single month.

Rock armoured embankment at the Ellenbrook potable water tank site

Ellenbrook Potable Water Dam Civil Works

WaterUtilities

Erosion control, drainage infrastructure and embankment rehabilitation at a potable water dam.

Benang worker compacting the trench inside the shoring box on the Narembeen mains replacement

Narembeen Mains Replacement

Water Corporation

WaterUtilities

Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a four week window.

Trenching along the main extension route through Babakin farmland

Babakin Main Extension

Water Corporation

WaterUtilities

Around 450 metres of asbestos cement and MSCL mains replaced with PVC inside a five week window.

Twin surge vessels with the new green DN100 MSCL bypass pipework and valves at Gwelup

Gwelup Surge Vessel Bypass

WaterUtilities

DN100 MSCL pipework replacement on the surge vessel bypass at Gwelup.

Valve upgrade works under way at the Katanning wastewater treatment plant

Katanning WWTP Improvements

WaterUtilities

Piping, pontoon control vessel, valve and manhole upgrades and civil remediation in five weeks.

Work with us

Ready to discuss your project?

Our team is ready to help. Whether you are scoping a tender, planning a build, or exploring multi-utility delivery, get in touch.